AD4S - Basement Shack/Office
February, 2006
Trim, Caulk, Paint, Lighting and Electrical Done
This took a lot longer than I thought it would but there was a lot of wait time between coats of paint on the woodwork. There was a lot of trim work and caulking that took time to get right.
Now on to the bookshelves, storage cabinets, work surfaces and floor.
Pickett, AD4S
These pictures are not up to my normal standard. My digital camera was dropped (not by me) and damaged and I used a cheap "point and shoot" camera to take these pictures.
![]() |
![]() |
![]() |
This page last updated 03/18/2006