AD4S - Basement Shack/Office
February, 2006
"SFFF" Sheetrock Finishing (mud) is Finally Finished.
Well it took almost 2 weeks part time but I am finally finished with the dry wall work. Vacuumed and mopped the floor so will start on the paint and trim tomorrow.
For the first time I put a 3rd (skim) coat on the finish and sanded lightly with dry wall sand paper instead of a screen. It really made a difference even if it tood a little longer.
I will go back and cut the opening for the model train tunnel and the waste water cleanout when I do the trim.
Pickett, AD4S